Below are the publically available outputs from the MUSES project.

Work package 1 – Project Management

Interim Report

Work package 2 – Regional Overviews

Analytical Framework

1st Workshop Report – Poole

Work package 3 – Case Studies

Case study methodology

Case study stakeholder engagement

Case study 1A – Multi-use space between commercial fisheries and offshore wind farms in Scotland (East Coast of Scotland – North Sea)

Case study 1B – Tidal energy development and environmental protection and monitoring (North Coast of Scotland – Inner sound of the Pentland Firth – North Sea)

Case study 1C – Multi-use of off-shore wind farms with marine aquaculture and fisheries (German North Sea EEZ – North Sea)

Case study 2 – Marine Renewables & Aquaculture Multi-use including the use of marine renewable energy near the point of generation (West Coast of Scotland – Northern Atlantic Sea)

Case study 3A – Development of tourism and fishing in the Southern Atlantic Sea (South Coast of mainland Portugal – Algarve region – Atlantic Sea)

Case study 3B – Development of tourism and fishing in the Southern Atlantic Sea (Azores archipelago – Eastern Atlantic Sea)

Case study 4 – Multi-Use for local development focused on energy production, tourism and environment in Swedish waters (Island of Gotland – Baltic Sea)

Case study 5 – Offshore wind and mariculture: potentials for multi-use and nutrient remediation in Rødsand 2 (South Coast of Lolland-Falster – Denmark – Baltic Sea)

Case study 6 – Coastal & Maritime Tourism and O&G Decommissioning as drivers for potential Multi-use in the Northern Adriatic Sea (Italy – Mediterranean Sea)

Case Study 7 – Marine Renewable Energy Sources & Desalination, Fishing & Tourism in the South Aegean: the case of Mykonos Island (Greece – Mediterranean Sea).

In addition to the case study reports (downloadable using the links above) a short introductory report is also available to download.

Work package 4 – Action Plan

Stakeholder Profiles

Work package 5 – Dissemination

1st Infographic

Exploitation of Results Plan

Newsletter I

Newsletter II

Newsletter III